Member since Feb 26, 2015

Contributions:

  • Posted by:
    Noway Jose on 03/24/2015 at 3:10 PM
    I am surprised that the COT was able to get anything out the door for construction.
    Usually, their share of the road is built by someone else because they cannot do the environmental planning and just hand over the reins to an engineering company when it comes to actually doing design work.
    The RTA was passed because of vote changing behind doors.